ASSET International - Products - VARIOGUARD®
VARIOGUARD®

Case Study

TEMPORARY ASSET VARIOGUARD® SYSTEM


Kingston Bridge

KINGSTON BRIDGE

Main contractor, Graham Ltd., chose ASSET to design, supply and install the temporary barriers on this contract. ASSET VARIOGUARD®, anchored at 20m centres, was installed across the length of the bridge. At one end a special length of ASSET SOLOGUARD® was installed enabling the traffic to be switched from one side of the ASSET VARIOGUARD® to the other side.

Within the confines of the site, over 300m of the ASSET MASS barrier was used to deliniate the work area from site vehicles.